When Do Victoria’s All-Electric Home Requirements Begin?
Victoria’s all-electric requirements take effect from 1 January 2027.
They generally apply to new homes with a building permit issued on or after this date. These homes will not be able to include a new connection to the reticulated natural gas network or natural gas appliances for cooking, space heating or water heating.
Homes with a building permit issued before 1 January 2027 may still be connected to natural gas. Limited transitional arrangements and exemptions may also apply in certain circumstances.
Importantly, the key date is generally when the building permit is issued, not when the building contract is signed. Buyers planning to build around this time should ask their builder which specification will apply to their home.
What Is an All-Electric Home?
This generally includes:
induction or electric cooking
electric heating and cooling
a heat-pump or electric hot water system
no new mains natural gas connection
solar power where included or required to support the home’s energy assessment
Removing natural gas involves more than changing the cooktop. The home’s hot water, heating, cooling, solar and electrical capacity also need to be considered.